Srinivas: +91 9966871942
Chaitanya: +91 9032444837
Siva: +91 8712383363

setting a fly ash bricks machinery for brickwork of a load-bearing wall

After the base concrete foundation has set,the lines giving the projections of the bottom course of the footings will be transferred from the profile board to the bottom of the trench on the concrete surface as described  clc bricks machinery in rajahmundry .this is accomplished by using a plumb line suspended from the ranging line and its position marked on a mortar screed spread on the concrete, marks being made at each end of the wall being set out.in this way,first the positions of each corner are marked out and the corners are built.it is always advisable to check the fly ash brick wall line again with ranging lines strained between the profiles at the corners before the ground level is reached so that slight adjustments can be made good at this stage of construction below the ground level.

Share...Share on Facebook0Tweet about this on Twitter0Share on Google+0Share on LinkedIn0Pin on Pinterest0

Latest Blog Posts

Address

Siva & Srinivas
# 53-41-4, Near Sivalayam,
Maddilapalem, Visakhapatnam,
A.P. South India.
Email: sourceinfratech.info@gmail.com

Location

CLC Brick Qualities

Light in Weight
High Thermal Insulation
Flexible in Size
High Fire Protection
High Sound Insulation
Lower Water Absorption
Eco-friendly
Universal Acceptability